TSK-000358 · Action

Drainage Geometry and Hydraulic Design Criteria

Explore the capability, case, and equipment connections for this activity.

Conceptual engineering illustration: thermal hydraulic analysis
Conceptual engineering visualization · AI generated

Activity Detail

Defined drainage design criteria: 545 GPM design basis, 135-ft reinforced concrete channel, 1-ft channel width, 12-in depth, 4% slope, #4 rebar, 8 in x 8 in stainless gutters with five 4 in x 5 in downspouts, 85 ft x 4 ft x 2 ft Phase 1 void, and 445 anchor.

Case Context

Drainage, Weir and Debris-Screen Design Details ↗

Project Context

PRJ-A-033 · Drainage and Erosion-Control Project Overview ↗

Capabilities

All Portfolio Connections

All portfolio connections (8)

Project Ownership and Delivery Context

Owned the full project lifecycle: capital planning and prioritization, need definition, feasibility and scope development, engineering and AFE justification, procurement and vendor coordination, construction sequencing and field oversight, commissioning, turnover, and post-startup support. Connected operating requirements with technical scope, funding decisions, execution readiness, and the needs of operations and maintenance.

Developed the reinforced channel, debris screens, five-step weir, outlet basin and stabilization scope. Curbing, grading, landscaping and wastewater-collection interfaces were coordinated with the work. The system reduced sediment carry by more than 90 percent while providing a maintainable runoff path.

Related Analysis and Application Artifacts