
TSK-000358 · Action
Drainage Geometry and Hydraulic Design Criteria
Drainage, Weir and Debris-Screen Design Details
APOLLO AUTOMATIONJAMES WARREN · ENGINEERING & PROJECT LEADERSHIPCAP-0073 · Engineering practice
Civil, Structural, Concrete, and Site Engineering

Technical Systems Ownership · Civil, structural, concrete, and site engineering

TSK-000358 · Action
Drainage, Weir and Debris-Screen Design Details

TSK-000054 · Action
Erosion Remediation and Rainwater Management

TSK-000376 · Method
Drainage, Weir and Debris-Screen Design Details

TSK-000334 · Method
Phase 1 Drainage Remediation
Recorded applicationFacility work covered enclosure rehabilitation, ventilation, drainage, erosion control and electrical-room protection. Scopes brought together access, scaffolding, structural and civil interfaces, weather barriers, ductwork, fans, electrical feeds and interlocks. Coordinated the disciplines around the operating needs of the facility.