Engineered Gutters, Channel, Removable Stainless Screens, Weir, Outlet Basin, Flowable Fill Void Fill, Foundation Prep, Gravel Backfill, Material Staging, Survey Benchmarks, Erosion Controls, and Phased Construction Scope
Explore the capability, case, and equipment connections for this activity.

Case Context
Drainage, Weir and Debris-Screen Design Details ↗Project Context
PRJ-A-033 · Drainage and Erosion-Control Project Overview ↗Capabilities
- Design Maintainable Debris ScreensRecorded application
Why these connect
The source model links this activity to the capability.
- Develop Weirs and Energy-Dissipation DetailsRecorded application
Why these connect
The source model links this activity to the capability.
- Plan Foundation Stabilization and Phased AccessRecorded application
Why these connect
The source model links this activity to the capability.
- Sequence Erosion Control and Drainage ConstructionRecorded application
Why these connect
The source model links this activity to the capability.
- Size Drainage Conveyance and Roof InterfacesRecorded application
Why these connect
The source model links this activity to the capability.
Systems & Equipment
All Portfolio Connections
All portfolio connections (11)
- Civil, Structural, Concrete, and Site Engineering — Application Review Review artifact
- Stormwater, Drainage, and Erosion Control — Application Review Review artifact
- Design Maintainable Debris Screens Recorded application
- Develop Weirs and Energy-Dissipation Details Recorded application
- Plan Foundation Stabilization and Phased Access Recorded application
- Sequence Erosion Control and Drainage Construction Recorded application
- Size Drainage Conveyance and Roof Interfaces Recorded application
- Engineered Gutters, Channel, Removable Stainless Screens, Weir, Outlet Basin, Flowable Fill Void Fill, Foundation Prep, Gravel Backfill, Material Staging, Survey Benchmarks, Erosion Controls, and Phased Construction Scope ↗ Existing portfolio connection
- Drainage and Stormwater ↗ Existing portfolio connection
- Drainage and Erosion-Control Project Overview Existing portfolio connection
- Drainage, Weir, Debris Screen, Outlet Basin, and Phase 1 Remediation Existing portfolio connection
Project Ownership and Delivery Context
Owned the full project lifecycle: capital planning and prioritization, need definition, feasibility and scope development, engineering and AFE justification, procurement and vendor coordination, construction sequencing and field oversight, commissioning, turnover, and post-startup support. Connected operating requirements with technical scope, funding decisions, execution readiness, and the needs of operations and maintenance.
Developed the reinforced channel, debris screens, five-step weir, outlet basin and stabilization scope. Curbing, grading, landscaping and wastewater-collection interfaces were coordinated with the work. The system reduced sediment carry by more than 90 percent while providing a maintainable runoff path.
Related Analysis and Application Artifacts
- Civil, Structural, Concrete, and Site Engineering — Application ReviewCapability application review
- Stormwater, Drainage, and Erosion Control — Application ReviewCapability application review