
TSK-000369 · Technical scope
4 in Perforated PVC Relief Lines
Drainage, Weir and Debris-Screen Design Details
APOLLO AUTOMATIONJAMES WARREN · ENGINEERING & PROJECT LEADERSHIPCAP-0077 · Engineering practice
Stormwater, Drainage, and Erosion Control

Technical Systems Ownership · Stormwater, drainage, and erosion control

TSK-000369 · Technical scope
Drainage, Weir and Debris-Screen Design Details

TSK-000380 · Technical context
Drainage and Erosion-Control Project Overview

TSK-000331 · Method
Tank-Slab Drainage and Weir-System Engineering

TSK-000054 · Action
Erosion Remediation and Rainwater Management

TSK-000374 · Technical scope
Drainage, Weir and Debris-Screen Design Details

TSK-001067 · Engineering scope
Drainage, Weir and Debris-Screen Design Details

TSK-000370 · Technical scope
Drainage, Weir and Debris-Screen Design Details

TSK-000332 · Method
Full Drainage Channel & Weir System
Recorded applicationFacility work covered enclosure rehabilitation, ventilation, drainage, erosion control and electrical-room protection. Scopes brought together access, scaffolding, structural and civil interfaces, weather barriers, ductwork, fans, electrical feeds and interlocks. Coordinated the disciplines around the operating needs of the facility.