Why the Work Mattered

Purpose and Operating Need

A network cutover is only maintainable if switch names, cabinet labels, HMI / PLC labels, revision panels, and cable identifiers can be understood by future engineers and technicians.

Engineering Approach

Engineering Approach

Development scope: shortened switch names, under-20-character labels, no-special-symbol label conventions, IDF panel naming, ceramic filter labels, tank-level monitor labels, processing switch labels, feed / permeate manifold labels, centrifuge labels, Bulk Process scrubber labels, and fiber revision-cable identifiers from IT switch port to breakout panel to engineering switch port.

Outcome & Engineering Context

Outcome and Context

Improved network traceability and field maintainability.

Workstream Results & Impact

Workstream Portfolio Rollup

4,942,000 USD

OT Network and Controls Transformation

Recorded workstream portfolio reference. This is the workstream-level value and is not a project expenditure or a new total of reassigned projects.

Measures & Operating Detail

Engineering scope and design basis

Improved troubleshooting speed, panel readability, cabling traceability, and future maintenance accuracy.

Developed shortened switch names, under-20-character labels, no-special-symbol label conventions, IDF panel naming, ceramic filter labels, tank-level monitor labels, processing switch labels, feed / permeate manifold labels, centrifuge labels, Bulk Process scrubber labels, and fiber revision-cable identifiers from IT switch port to breakout panel to engineering switch port.

Improved OT documentation maintainability, measured by standardized labels for IDF panels, switches, PLCs, HMIs, VFDs, manifolds, tank-level monitors, and fiber revision-cable endpoints, by creating concise, field-usable naming conventions for network and control assets.

Under-20-character labels; IDF panel names; switch abbreviations; fiber endpoint tags; PLC/HMI/VFD/manifold labels.

Actions, Methods & Controls

ACTIVITIES IN CONTEXT

Additional Technical Detail

Roles & contributions
  • Project Ownership

    Full lifecycle project ownership

    Owned the full project lifecycle: capital planning and prioritization, need definition, feasibility and scope development, engineering and AFE justification, procurement and vendor coordination, construction sequencing and field oversight, commissioning, turnover, and post-startup support. Connected operating requirements with technical scope, funding decisions, execution readiness, and the needs of operations and maintenance.

Workstream context
All portfolio connections
Project ownership and delivery context

Owned the full project lifecycle: capital planning and prioritization, need definition, feasibility and scope development, engineering and AFE justification, procurement and vendor coordination, construction sequencing and field oversight, commissioning, turnover, and post-startup support. Connected operating requirements with technical scope, funding decisions, execution readiness, and the needs of operations and maintenance.

Developed the fiber and managed-switch architecture, resilient power arrangements, configuration and rollback requirements, and cutover sequence. Network drawings, device labeling and validation connected the installation with operator and maintenance needs. The work included a 10 Gbps backbone and 13 UPS-backed resilience points.

Related analysis and application artifacts