CASE-050 · Engineering case

Lines 1 & 2 Bottling Expansion

Developed a multi-phase high-speed 64 oz / 128 oz bottling expansion to improve packaging capacity, changeover efficiency, and SKU segmentation.

Conceptual engineering visualization: Lines 1 & 2 Bottling Expansion
Conceptual engineering visualization · AI generated

Why the Work Mattered

Purpose and Operating Need

Developed a multi-phase high-speed 64 oz / 128 oz bottling expansion to improve packaging capacity, changeover efficiency, and SKU segmentation.

Engineering Approach

Engineering Approach

Development scope: line layout, equipment specification, utility coordination, warehouse-flow model, labor plan, civil/facility upgrades, controls architecture, and capital budget.

Outcome & Engineering Context

Developed a multi-phase high-speed 64 oz / 128 oz bottling expansion to improve packaging capacity, changeover efficiency, and SKU segmentation.

Workstream Results & Impact

Workstream Portfolio Rollup

28,095,000 USD

Production and Packaging Modernization

Recorded workstream portfolio reference. This is the workstream-level value and is not a project expenditure or a new total of reassigned projects.

Measures & Operating Detail

MeasureValueType & meaningAttribution & operating context
Modeled annual labor-cost reductionapproximately 135,000 USDEstimate
Projected annual benefit

Applies to: Lines 1 & 2 Bottling Expansion

Expansion planning — approximately $135,000 annual labor optimization.

128 Oz Line Design Speed121 BPMDesign Parameter
Design capacity

Applies to: Lines 1 & 2 Bottling Expansion

Bottling expansion design — 121 BPM for 128 oz

64 Oz Line Design Speed200 BPMDesign Parameter
Design capacity

Applies to: Lines 1 & 2 Bottling Expansion

Bottling expansion design — 200 BPM for 64 oz

Annual Changeover Reduction183 hours/yearEstimate
Projected changeover reduction

Applies to: Lines 1 & 2 Bottling Expansion

Bottling expansion design — 183 hours/year changeover reduction

OEE Capacity Reclaimed5.5 %Estimate
Projected operating improvement

Applies to: Lines 1 & 2 Bottling Expansion

Bottling expansion design — 5.5% OEE reclaimed

Engineering scope and design basis

121 BPM for 128 oz; 200 BPM for 64 oz; 183 hours/year changeover reduction; 5.5% OEE reclaimed; approximately $135K first-year labor optimization.

Actions, Methods & Controls

ACTIVITIES IN CONTEXT

Additional Technical Detail

Roles & contributions
  • Project Ownership

    Full lifecycle project ownership

    Owned the full project lifecycle: capital planning and prioritization, need definition, feasibility and scope development, engineering and AFE justification, procurement and vendor coordination, construction sequencing and field oversight, commissioning, turnover, and post-startup support. Connected operating requirements with technical scope, funding decisions, execution readiness, and the needs of operations and maintenance.

Workstream context
All portfolio connections
All portfolio connections (44)
Project ownership and delivery context

Owned the full project lifecycle: capital planning and prioritization, need definition, feasibility and scope development, engineering and AFE justification, procurement and vendor coordination, construction sequencing and field oversight, commissioning, turnover, and post-startup support. Connected operating requirements with technical scope, funding decisions, execution readiness, and the needs of operations and maintenance.

Developed the line scope around equipment, pasteurization, utility and electrical interfaces. Used takt, FIFO, OEE and labor modeling to connect equipment choices with production demand, while construction sequencing, safety circuits and startup planning tied the design to live-plant execution.

Related methods and applications
Related analysis and application artifacts
Connected collections

WHAT COMES NEXT

Complex Challenge?
Let’s Work Through It.

Engineering leadership, capital projects, and independent consulting.

Start a conversation ↗