CASE-079 · Engineering case

3X 160-Ton Chiller Production Cooling Upgrade

Led the production-cooling upgrade replacing two 110-ton chillers and one 60-ton chiller with three 160-ton chillers.

Conceptual engineering visualization: 3x 160-Ton Chiller Production Cooling Upgrade
Conceptual engineering visualization · AI generated

Why the Work Mattered

Purpose and Operating Need

Led the production-cooling upgrade replacing two 110-ton chillers and one 60-ton chiller with three 160-ton chillers.

Engineering Approach

Engineering Approach

Coordinated replacement of two 110-ton chillers and one 60-ton chiller with three 160-ton chillers, including mechanical tie-ins, electrical feeds, controls, startup and operating validation.

Outcome & Engineering Context

Led the production-cooling upgrade replacing two 110-ton chillers and one 60-ton chiller with three 160-ton chillers.

Workstream Results & Impact

Workstream Portfolio Rollup

14,998,000 USD

Cooling and Utility Reliability Modernization

Recorded workstream portfolio reference. This is the workstream-level value and is not a project expenditure or a new total of reassigned projects.

Measures & Operating Detail

MeasureValueType & meaningAttribution & operating context
Net Added Production Cooling200 refrigeration tonsEquipment Rating
Installed nominal cooling-capacity addition

Applies to: 3x 160-Ton Chiller Production Cooling Upgrade

Net added production cooling.

Cooling Energy Reduction at Feeder Monitoring Points15 %Actual Result
Feeder-level measured reduction

Applies to: 3x 160-Ton Chiller Production Cooling Upgrade

15% cooling energy reduction at individual chiller feeder monitoring points; no plant-wide energy claim.

Engineering scope and design basis

Led the production-cooling upgrade replacing two 110-ton chillers and one 60-ton chiller with three 160-ton chiller units.

Added +200 tons net production-cooling capacity; 15% cooling energy reduction recorded at individual feeder monitoring points.

Coordinated replacement of two 110-ton chillers and one 60-ton chiller with three 160-ton chiller units, including mechanical tie-ins, electrical feeds, controls, startup and operating validation.

Actions, Methods & Controls

ACTIVITIES IN CONTEXT

Additional Technical Detail

Roles & contributions
  • Project Ownership

    Full lifecycle project ownership

    Owned the full project lifecycle: capital planning and prioritization, need definition, feasibility and scope development, engineering and AFE justification, procurement and vendor coordination, construction sequencing and field oversight, commissioning, turnover, and post-startup support. Connected operating requirements with technical scope, funding decisions, execution readiness, and the needs of operations and maintenance.

Workstream context
All portfolio connections
Project ownership and delivery context

Owned the full project lifecycle: capital planning and prioritization, need definition, feasibility and scope development, engineering and AFE justification, procurement and vendor coordination, construction sequencing and field oversight, commissioning, turnover, and post-startup support. Connected operating requirements with technical scope, funding decisions, execution readiness, and the needs of operations and maintenance.

modeled demand and the roughly 78-ton peak thermal deficit, coordinated pumps and recirculation, and developed chiller staging and runtime balancing. Operating visibility and process-load monitoring connected the three 160-ton production chillers with the way the plant used cooling capacity.

Related analysis and application artifacts
Connected collections

WHAT COMES NEXT

Complex Challenge?
Let’s Work Through It.

Engineering leadership, capital projects, and independent consulting.