JAMES WARREN · PROJECT INDEX

42 Named Projects

ProjectWorkstreamInitiative
PRJ-A-001 · Line 1 Filler and Conveyor UpgradeProduction and Packaging ModernizationLine 1 Filler and Conveyor Upgrade
PRJ-A-002 · Line 2 Pasteurizer UpgradesProduction and Packaging ModernizationLine 2 Pasteurizer Upgrades
PRJ-A-003 · Line 1 Pasteurizer RepairProduction and Packaging ModernizationLine 1 Pasteurizer Repair
PRJ-A-004 · Line 1 Mixer Bottle Conversion to 28 mm PCOProduction and Packaging ModernizationLine 1 Mixer Bottle Conversion to 28 mm PCO
PRJ-A-005 · Lines 1 & 2 Bottling and Packaging LinesProduction and Packaging ModernizationLines 1 & 2 Bottling and Packaging Lines
PRJ-A-006 · Acetator Project A9 and A10Vinegar Acetation and Fermentation-Support ModernizationAcetator Project A9 and A10
PRJ-A-007 · Acetator Expansion Project + VOC Scrubber SystemsVinegar Acetation and Fermentation-Support ModernizationAcetator Expansion Project + VOC Scrubber Systems
PRJ-A-008 · Acetator #6 and ACV Filtering ExpansionVinegar Acetation and Fermentation-Support ModernizationAcetator #6 and ACV Filtering Expansion
PRJ-A-009 · Acetator ExpansionVinegar Acetation and Fermentation-Support ModernizationAcetator Expansion
PRJ-A-010 · Ceramic Crossflow Filter System + Ion Exchange TrialWine Clarification and Vinegar Polishing ModernizationCeramic Crossflow Filter System + Ion Exchange Trial
PRJ-A-011 · Winery Centrifuge and CIP Interface Engineering + Vinegar Transfer Centrifuge LoopWine Clarification and Vinegar Polishing ModernizationWinery Centrifuge and CIP Interface Engineering + Vinegar Transfer Centrifuge Loop
PRJ-A-012 · Centrifuge Installation and Interface EngineeringWine Clarification and Vinegar Polishing ModernizationCentrifuge Installation and Interface Engineering
PRJ-A-013 · Centrifuge Filtration Recovery and Equipment-Relocation EvaluationWine Clarification and Vinegar Polishing ModernizationCentrifuge Filtration System
PRJ-A-014 · Wine Pre-Filtration Trial and Downstream Throughput EvaluationWine Clarification and Vinegar Polishing ModernizationCentrifuge Filtration System
PRJ-A-015 · Winery Centrifuge FiltrationWine Clarification and Vinegar Polishing ModernizationWinery Centrifuge Filtration
PRJ-A-016 · Centrifuge FiltrationWine Clarification and Vinegar Polishing ModernizationCentrifuge Filtration
PRJ-A-017 · Electrical Infrastructure ModernizationElectrical Infrastructure ModernizationElectrical Infrastructure Modernization
PRJ-A-018 · Boiler System + Plant Steam & Condensate OptimizationSteam and Boiler System ModernizationBoiler System + Plant Steam & Condensate Optimization
PRJ-A-019 · Warehouse Heat-Reduction Ventilation Project OverviewSteam and Boiler System ModernizationWarehouse Heat-Reduction Ventilation Project Overview
PRJ-A-020 · Steam-System Repair and Temperature-Control RetrofitSteam and Boiler System ModernizationReduction System Steam Repair and Temperature Control Retrofit · WP-076
PRJ-A-021 · Production-Cooling Upgrade with Three 160-Ton ChillersCooling and Utility Reliability ModernizationProduction-Cooling Upgrade with Three 160-Ton Chillers
PRJ-A-022 · Fermenter & Acetator Cooling Alarm SystemCooling and Utility Reliability ModernizationFermenter & Acetator Cooling Alarm System
PRJ-A-023 · Cooling Tower, Chiller Circuit, and Injection Well RetrofitCooling and Utility Reliability ModernizationCooling Tower, Chiller Circuit, and Injection Well Retrofit
PRJ-A-024 · 250 Ton Chiller Standby CapacityCooling and Utility Reliability Modernization250 Ton Chiller Standby Capacity
PRJ-A-025 · Acetator A5 Upgrade and Cooling CoordinationCooling and Utility Reliability ModernizationAcetator A5 Upgrade and Cooling Coordination
PRJ-A-026 · Line 1 Capper and Conveyor Upgrade + Bulk Nitrogen TransitionChemical Dosing and Storage ModernizationLine 1 Capper and Conveyor Upgrade + Bulk Nitrogen Transition
PRJ-A-027 · Nitrogen Dosing, Automated Microbulk Refill Station + Storage Tank ConversionChemical Dosing and Storage ModernizationNitrogen Dosing, Automated Microbulk Refill Station+ Storage Tank Conversion
PRJ-A-028 · Fiberoptic OT NetworkOT Network and Controls TransformationFiberoptic OT Network
PRJ-A-029 · Tank Measurement Project StandardizationOT Network and Controls TransformationTank Measurement Project Standardization
PRJ-A-030 · Tank-Level Measurement Standards and Procurement AlignmentOT Network and Controls TransformationTank-Level Measurement Standards and Procurement Alignment
PRJ-A-031 · Tank-Measurement Standards for Future UpgradesOT Network and Controls TransformationTank-Measurement Standards for Future Upgrades
PRJ-A-032 · Tank-Level Monitoring and Field-Access PlanningOT Network and Controls TransformationTank-Level Monitoring and Field-Access Planning
PRJ-A-033 · Drainage and Erosion-Control Project OverviewEnvironmental Compliance and Recovery SystemsDrainage and Erosion-Control Project Overview
PRJ-A-034 · Filtering-Room Acetator Electrical Control RoomEnvironmental Compliance and Recovery SystemsFiltering Room Acetator Electrical Control Room (SHI-25)
PRJ-B-001 · Fermentation Extract Manufacturing CommercializationProduct Application and Intellectual-Property ExpansionFermentation Extract Manufacturing Commercialization
PRJ-B-002 · Processed Meat and Seafood Soluble RBE Application PlatformProduct Application and Intellectual-Property ExpansionProcessed Meat and Seafood Soluble RBE Application Platform
PRJ-B-003 · Rice Bran Extract Meat-Analogue Platform ExtensionProduct Application and Intellectual-Property ExpansionRice Bran Extract Meat-Analogue Platform Extension
PRJ-B-004 · Continuous Fermentation Natural Curing-Agent ProcessVinegar Acetation and Fermentation-Support ModernizationContinuous Fermentation Natural Curing-Agent Process
PRJ-B-005 · Manufacturing Scheduling and MOM/MES EvaluationOT Network and Controls TransformationManufacturing Scheduling and MOM/MES Evaluation
PRJ-B-006 · Sustainable Water Treatment, Heat Recovery, and Wastewater ReuseEnvironmental Compliance and Recovery SystemsSustainable Water Treatment, Heat Recovery, and Wastewater Reuse
PRJ-B-007 · 480 V Electrical Service and Power-Quality ModernizationElectrical Infrastructure Modernization480 V Electrical Service and Power-Quality Modernization
PRJ-B-008 · Ammonia/Glycol Refrigeration Safety, Compliance, and Mechanical-Integrity RetrofitEnvironmental Compliance and Recovery SystemsAmmonia/Glycol Refrigeration Safety, Compliance, and Mechanical-Integrity Retrofit